rock slope protection fabric (class 8) 591200 rock stain: 780450 rock stain: 720110 small-rock slope protection: 192032 structure excavation (rock slope protection) (engmet) Click on the product name for a data sheet. XYo[unHCih,(~
t@K{
y.EmvKhy?_\F6.nO?iV5FlD,#t~J7z@Al.z_ooA=H
/$Q-Aav. Contract Cost Data Project Details. This information is to be used only as a guide. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Place a layer (six inch minimum) of The State of Maryland pledges to provide constituents, businesses, customers, and stakeholders with friendly and courteous, timely and responsive, accurate and consistent, accessible and convenient, and truthful and transparent services. When slope protection is paid by volume, review the plans and quantity calculations in the resident engineers file to determine if there is sufficient detail and accuracy to be used in the project records. Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. Also, ensure the contractor does not drop rock into place; otherwise, cracking or breaking may occur. The plans indicate the minimum depths of foundations. If the slope is steeper than 2:1, do not use rounded boulders and cobbles. endobj DM[2TI=lGQx7
UoFK1: V;39LFOr7LxPF{BL3he6X^@v[QhWiF!l3F)
RTIBfx0.T F%n3h80Q,`[2xa%VLP /WD@j rK .9{N[#o/Fad#OK6YeqsyHl2M)V]/Nf(V?!1Oaw)fM 8JG)31m. 10 0 obj The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. If your 20'x10' patio is to have a 6" base, then you should excavate a total area of 21' (20' +6" +6") by 11' (10' +6" +6"). 2. Mirafi N-Series nonwovens combine high water flow rates, high soil interaction and durability while providing excellent soil particle retention. 2 0 obj The samples will be crushed in the laboratory to sizes needed to perform tests. The maximum height of the vertica l lower portions 3.5 feet. Products with a are available to meet BABA (Build America, Buy America) requirements. 1 or call The contractor must also ensure the construction of adequate returns and keys at the ends. Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. requirements. +NXR!ft]l|\P2. Intermediate, or B dimension (i.e., width) where A dimension is length, and C dimension is thickness. You may be trying to access this site from a secured browser on the server. L Earth Compacted Fabric Engineering 6'' 1'-0'' centers Staples at 6'' 2'' 6'' (Rock Splash Basin) TYPE 4 1 2 (Rock Slope Protection) TYPE 5 Staples at 12 inch centers. Information reported to the hotline in the past has helped to eliminate certain fraudulent activities and protect State resources. Mirafi 135N, 140NL and 140NC are lighter weight versions of Mirafi 140N . 0000002021 00000 n
You may check the size of rock by roughly measuring the size and converting the volume to mass. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . The concrete slope protection method consists of paving the embankment with portland cement concrete. TenCate develops and produces materials that function to increase performance, reduce costs and deliver measurable results by working with our customers to provide advanced solutions. Observe closely during rock placement to detect any damage to the fabric. To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. Ensure the timber spacers are of the required material and spaced as planned. /Type/ExtGState Contact our sales team at 1-863-270-8118 to discuss your erosion control requirements. For details about concrete production, review Section 4-90, Concrete, of this manual. Riprap is a permanent layer of large, angular stone, cobbles, or boulders typically used to armor, stabilize, and protect the soil surface against erosion and scour in areas of concentrated flow or wave energy. /OPM 1 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. Temp. 0000008331 00000 n
1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. Center splash basin . { , IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN. uuid:30dd8676-a64b-4579-9ccf-fc82965d356f 0000012468 00000 n
Civil engineers and landscape architects need proven solutions to control soil erosion, stabilize slopes, enable drainage and create a visually pleasing landscape. Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. Refer to Section 4-96, Geosynthetics, of this manual for guidelines for inspecting and accepting rock slope protection fabric. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. %PDF-1.4 Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28
1}9AQ #T6Bc*)_vU"]T hY# There are three material gra requirements based on required rock layer dation thicknesses. Mirafi N-Series Product Description Sheet. If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . Angular shaped rock may be used on any planned slope. The contract plans will designate the required rock layer thickness for each location. Weight will vary based on density of rock available for the project. You can also lay bags of sand along problem areas in your landscape to keep soil from washing away and to redirect water. endobj Be sure to consult your local project engineer or construction professional about the rock sizing and particular . {.sAewh[w#Iv#W6f" $JOPf/W%%XKK&A~b ?nfY_iu"m]HDwP) Rp They blanket the soil, protecting it from wind and water forces. Complete the Patio or Walkway 6. :t4NV]j{/mtqF*sx[%M
5%(/%(Z-F|[atK5[~{a~EwDCV:/#K)f~7*RsAnnJa>Jg-m^>\V7EOG3o?nGYIFze/l( I!&VXo]mm#7I0:EK7_LFwek Suggested levels of inspection for slope protection activities are: Ensure the contractor is actively performing quality control on placing slope protection and slope paving throughout the operations. 0000014254 00000 n
C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. Nominal RSP class by median particle diameterb Nominal median US 160NW is a nonwoven needlepunched geotextile made of 100% polypropylene staple filaments. IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN Verify the types of measurements and records necessary to support payment for the work. (For large riprap, consider a four inch layer of sand to protect the . Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. Click on the to send the number to the For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. Use 5 to 7 st Use all suitable material in the work. 0000008354 00000 n
The finish surface must be roughened by brushing to expose rocks. endobj More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! Slope Protection consists of rock, concrete, or concreted rock or slope paving ROCK SLOPE PROTECTION ROCK SHOULD DEMONSTRATE Stability: Angular shapes may be used on any planed slope Durability: Resist degradation and have a durability of 52 minimum (Caltrans) Consistency: Product is the same load after load. Review contractors verification of unit weight of rock-filled gabions. Geotextiles. Barrier Landscape Edging & Paver Edging 6'/8. Please enable scripts and reload this page. The method is particularly adaptable to locations where high-velocity flow is not detrimental, but desirable, and the hydraulic efficiency of smooth surfaces is important. engineering fabric pinned to the slope, or both a . The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. California Department of Transportation RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. e&C+uPaN.%y5*>EJ9gcD,i4E|+I,b0 f)#H+E m:(B(u1b)Q%>cayKh 0SYB@RenkJ1HJ
b#'mYtQS1 HU" 2`VoVsB: ~',2g(5DZsHrxUR5~4
4_ {YNjTjdV \ (aazR#;@1""(*$4"!f)G(J Class E Revetment Erosion Stone or Class E Revetment Erosion Stone or A A Engineering Fabric Ditch Bottom 2' 2' Anchor Slot W 6'' min. At the start of gabion placement, require the contractor to verify the minimum unit weight of the gabions to ensure it meets specifications. Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. Soil Stabilization Matting - Slope Application, Clear Water Pipe Through Silt Fence/Super Silt Fence, Temporary Stone Outlet Structure (1 of 2, PDF only), Temporary Stone Outlet Structure (2 of 2, PDF only), Temporary Gabion Outlet Structure (1 of 2, PDF only), Temporary Gabion Outlet Structure (2 of 2, PDF only), Standard Inlet Protection (1 of 2, PDF only), Standard Inlet Protection (2 of 2, PDF only), Combination Inlet Protection (1 of 2, PDF only), Combination Inlet Protection (2 of 2, PDF only), Pipe Outlet Sediment Trap ST-I (1 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (2 of 3, PDF only), Pipe Outlet Sediment Trap ST-I (3 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (1 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (2 of 3, PDF only), Stone/Riprap Outlet Sediment Trap ST-II (3 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (1 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (2 of 3, PDF only), Riprap Outlet Sediment Trap ST-III (3 of 3, PDF only), Concentric Trash Rack and Anti-Vortex Device (1 of 2, PDF only), Concentric Trash Rack and Anti-Vortex Device (2 of 2, PDF only), Types of Couplers for Corrugated Steel Pipe, Sediment Basin Schematic - Horiz.
John Henry Williams Obituary,
Delaware County Daily Times Recent Obituaries,
Articles R